Project Profile — Industrial Manufacturing

First Solar — 550,000 SF Manufacturing Facility

Owner
First Solar
Role
Self-Performing Heavy Civil Site Contractor
Scope
Turnkey heavy civil site package
640,000 CY embankment
4,000,000 SF lime stabilization
1,500,000 SF cement-treated subbase
40,000 tons aggregate placed
Water, sewer, and storm utility systems
By the Numbers
640K CY
Embankment
4M SF
Lime stab.
1.5M SF
Cement base
40K tons
Aggregate

Single-contractor site package — graded, stabilized, paved subbase, and installed all underground utilities for the facility.