Skip to main content
Lost lake

Lost Lake

Project Profile — USACE Lost Lake — Marine Mass Concrete Owner U.S. Army Corps of Engineers Role USACE Civil Contractor — Marine Mass Concrete Scope Remote island construction Barge-supported concrete delivery 6,000+ CY of mass concrete placed Strict ACI mix-time requirements met Complex marine logistics and weather windows By the Numbers 6K+ CY Mass concrete Barge Delivery Island Remote site ...

Continue reading

Pelican Island

Project Profile — USACE Pelican Island — Coastal Dike Rehabilitation Owner U.S. Army Corps of Engineers Role USACE Civil Contractor — Earthwork & Marine Construction Scope 1.5 million CY of embankment placed Containment dike raising and reconstruction Concrete structures in marsh conditions Drainage system reconfiguration Logistics-driven marsh access and staging By the Numbers 1.5M...

Continue reading

project eagle-amazon

Project Eagle (Amazon)

Project Profile — E-Commerce Logistics Project Eagle — Amazon Distribution Facility Project Owner Amazon Role Turnkey Civil + Structural Concrete Contractor Scope Turnkey civil + structural package All concrete, paving, building foundations Tilt-wall construction — ~10,000 CY total concrete Site import, crushed stone base, lime-stabilized soils Complete storm drainage Complete water and sanitary sewer systems By the Numbers 10K...

Continue reading

comite job

Comite River Diversion

Project Profile — USACE Comite River Diversion Owner U.S. Army Corps of Engineers Role USACE Prime Contractor — Self-Performed Heavy Civil Scope Clearing & grubbing across ~100 acres Excavation of ~1.1M CY Stone placement of ~320K tons 40,000 CY major concrete structure 11,000 SF sheet piles + 142,000 LF H-piles driven Existing canal tie-ins through new drainage pipe connections By the Numbers 1.1M CY ...

Continue reading

First Solar

Project Profile — Industrial Manufacturing First Solar — 550,000 SF Manufacturing Facility Owner First Solar Role Self-Performing Heavy Civil Site Contractor Scope Turnkey heavy civil site package 640,000 CY embankment 4,000,000 SF lime stabilization 1,500,000 SF cement-treated subbase 40,000 tons aggregate placed Water, sewer, and storm utility systems By the Numbers 640K CY Embankment 4M SF Lime...

Continue reading